POWER PROJECTS
  • Started the contracting business of erection of hydro power projects about 3 decades back.
  • More than 5000 MW erection done till the date.
  • Erected hydro machines ranging from 1.2 MW to 300 MW capacities all over India.
  • 1400 MW of erection work is in hand.
  • Erection of large machines requires skilled manpower, special T & P and test equipments. The company is specialized in this field and is regularly carrying out erection of hydro machines for M/s Bharat Heavy Electricals Ltd. all regions, Voith Siemens, V. A. Tech, Alstom, M/s Jaiprakash Associates, Karnataka Power Corporation Ltd.  & Government of Maharashtra etc.
  • We have assembled,
  1. The biggest capacity stators & rotors in India   (4×300 MW) at Koyna Stage-IV generating   stations in Maharashtra.
  2. Erected the biggest spiral casings in India with inlet diameter 8 mtr., 5 Nos. at Almatti H.E.P., Karnataka state & 8 Nos. at Omkareshwar H.E.P. in Madhya Pradesh.
  3. Erected highest head turbines in India with 850 mtr. head at Lekimro H.E.P. site in Nagaland.
  4. Erected the highest capacity turbine and generators sets in India at 4×250 MW Tehri Hydro Electric Project.
  5. Assembled & erected the heaviest rotor assembly in India (650 Tonnes) at 4×250 MW Tehri H.E.P. site.
  6. Erected the highest capacity reversible turbine & genset in India with 150 MW capacity at Bhira Pumped Storage unit in Maharashtra
  • We are in the field of EPC contracts of electrical switchyard / sub-stations for co-generation plants and carried out the works for various sugar factories.
  • Recently entered into EPC contracts for small hydro projects and executing total 6 projects totaling 26 MW.
  • Involves design, manufacture, supply, erection, testing, commissioning and operation, maintenance for 1-2 years of all electromechanical equipments from penstock to switchyard.
  • As a part of hydro / thermal erection business we also provide operation & maintenance services to our clients during starting period of operation after synchronizing of the machines.
  • Renovation and upgradation of hydro machines.
  • Renovation of old hydro turbines by totally dismantling of unit, repair, modification or replacing of old turbine parts, sand blasting & painting of water conduit system, welding of runner and guide apparatus parts replacing.
  • Up-gradation of old generators by dismantling the machine and rewinding with special ‘F’ class insulation and necessary modifications.
  • White mettaling, re-machining and setting of bearings by scrapping etc.
  • Special type of electrical machines like H.T. motors, synchronous condensers of large capacities.
  • After successful implementation of EPC contracts now the company has started executing the projects on B.O.O.T. basis. Especially in small hydro projects.
  • About 10 MW projects are in hand and in the advance stage of completion.
  • Presently two projects have been allotted to us in Maharashtra and both are in the advance stage of completion.
  • Water to wire implementation of the project including land acquisition, getting clearances from different authorities, selection of land, power purchase agreement etc is also done by us.